Quality Manual Send this page to a friend

 

These key terms in clauses 4 through 8 of ISO 9001:2008 are indexed by page and clause. A clause number may be listed multiple times if that term appears more than once in the clause title and text.

The references are listed in sequence of occurrence in the text (for example, the index may identify 7.2.2, 7.2.2.a, and then list 7.2.2 again).

Index of Terms Page Clause
Ability 7 7.2.2.c
8 7.3.4.a
10 7.4.1, 7.5.2, 7.5.2
12 7.6, 7.6 (Note)
13 8.2.3
Absolve 2 4.1 (Note 3)
Acceptance 7 7.1.c, 7.2.2, 7.2.2, 7.2.2
9 7.3.3.c
13 8.2.4, 8.3.b
Accordance 2 4.1, 4.1
9 7.3.4, 7.3.5, 7.3.6
10 7.4.1
13 8.2.4
Achieve, Achieved, or Achievement 2 4.1.f
6 6.2.2.b, 6.2.2.d, 6.3, 6.4
10 7.5.2
13 8.2.3, 8.2.3
Action(s) 2 4.1.f
5 5.6.2 (d, e), 5.6.3
6 6.2.2 (b, c)
7 7.2.1 (Note), 7.2.2
9 7.3.4.b, 7.3.4, 7.3.5, 7.3.6, 7.3.7
10 7.4.1
11 7.6
12 8.2.2
13 8.2.2, 8.2.3, 8.3 (a, c, d), 8.3
14 8.4.c, 8.5.1, 8.5.2, 8.5.2, 8.5.2, 8.5.2 (c, d, e, f), 8.5.3, 8.5.3, 8.5.3, 8.5.3 (b, c, d, e)
Activities 2 4.1 (Note 1)
3 4.2.1 (Note 2.a)
6 6.2.2.d
7 7.1.c, 7.2.1.a
10 7.4.3, 7.5.1.f
12 8.2.2
Adequate or Adequacy 3 4.2.3.a
5 5.6.1
8 7.3.2
10 7.4.2
Adjusted or Adjustments 11 7.6 (b, d)
Advisable 13 8.2.3 (Note)
Affected 6 6.2.1 (Note)
11 7.6
Amended or Amendments 8 7.2.2, 7.2.3.b
Analyze or Analysis 2 4.1.e, 4.1 (Note 1)
12 8, 8.1 , 8.2.1 (Note)
13 8.4, 8.4
14 8.4, 8.5.1
Apparent 10 7.5.2
Apply, Applied, Application, or Applicable 2 4.1.a, 4.1.e, 4.2.1, 4.1 (Note 3, Note 3.c)
3 4.2.3 (d, g)
6 6.2.2.b, 6.3
7 7.1 (Note 1, Note 2), 7.2.1.c
8 7.3.2 (b, c)
9 7.3.6, 7.4.1
10 7.5.1, 7.5.2
11 7.5.5, 7.5.5
12 7.6, 7.6 (Note), 8.1
13 8.2.3, 8.2.3, 8.2.4, 8.3, 8.3 (b, c)
Appropriate 4 5.3.a
5 5.5.3
6 6.2.1, 6.2.2.e
7 7.1
8 7.3.1.b, 7.3.1
9 7.3.3.b, 7.3.7
10 7.4.2
11 7.5.3, 7.6
13 8.2.3, 8.2.3 (Note), 8.2.4, 8.3.d, 8.4
14 8.5.2, 8.5.3
Approve, Re-Approve, Approved, or Approval 3 4.2.3.a, 4.2.3.b
8 7.3.3
9 7.3.7
10 7.4.2.a, 7.5.2 (a, b)
13 8.2.4
Arrangements 8 7.2.3
9 7.3.4, 7.3.5, 7.3.6
10 7.4.3, 7.5.2
12 8.2.2.a
13 8.2.4, 8.2.4
Area(s) 12 8.2.2, 8.2.2
Assignment 8 7.3.1
Assess or Assessing 5 5.6.1
11 7.6
Audit(s), Audited, or Auditors 5 5.6.2.a
12 8.2.2, 8.2.2, 8.2.2, 8.2.2, 8.2.2, 8.2.2, 8.2.2, 8.2.2, 8.2.2, 8.2.2, 8.2.2, 8.2.2, 8.2.2, 8.2.2
14 8.5.1
Authority, Authorities, or Authorizing 4 5.5, 5.5.1, 5.5.1
5 5.5.2
8 7.3.1.c
13 8.2.4, 8.2.4, 8.3, 8.3.b, 8.3.b
Available or Availability 2 4.1.d
3 4.2.3.d
4 5.1.e
10 7.5.1 (a, b, d)
Aware or Awareness 5 5.5.2.c
6 6.2.2, 6.2.2.d
8 7.2.2
Basis 6 6.2.1
11 7.6.a
Business 12 8.2.1 (Note)
Calibrated or Calibration 11 7.6.a, 7.6.a, 7.6.c, 7.6
Capability 2 4.1 (Note 3a, 3c)
Care 11 7.5.4
Carry Out or Carried Out 4 5.4.2.a
10 7.5.1
11 7.6, 7.6
13 8.2.4
Cause(s) 12 8.2.2
14 8.5.2, 8.5.2.b, 8.5.3, 8.5.3.a
Changes or Changed 3 4.2.3.c
4 5.4.2.b
5 5.6.1, 5.6.2.f
7 7.2.2
8 7.2.2, 7.2.2
9 7.3.7, 7.3.7, 7.3.7, 7.3.7, 7.3.7, 7.3.7
Characteristics 9 7.3.3.d
10 7.5.1.a
13 8.2.4
14 8.4.c
Claims 12 8.2.1 (Note)
Clear 8 7.3.1
Collect 13 8.4
Combination 8 7.3.1 (Note)
Commitment 3 5.1, 5.1
4 5.3.b
7 7.2.2
Communicated, Communicating, or Communication 4 5.1.a, 5.3.d, 5.5, 5.5.1
5 5.5.3, 5.5.3, 5.5.3
6 6.3
8 7.2.3, 7.2.3, 7.3.1
10 7.4.2
Competence 3 4.2.1 (Note 2.c)
6 6.2.2, 6.2.2.a, 6.2.2.b
Complaints 8 7.2.3.c
14 8.5.2.a
Complete or Completed 8 7.3.2
9 7.3.6
13 8.2.4
Compliments 12 8.2.1 (Note)
Comply 4 5.3.b
Computer 12 7.6, 7.6 (Note)
Concerned 9 7.3.4
Concessions 13 8.3.b, 8.3
Conditions 6 6.4 (Note)
10 7.5.1, 7.5.1
Conduct, Conducting, or Conducted 4 5.1.d
7 7.2.2
8 7.3.1 (Note)
12 8.2.2, 8.2.2, 8.2.2
Configuration 11 7.5.3 (Note)
12 7.6 (Note)
Confirmed, Re-confirmed, or Confirmation 7 7.2.2
12 7.6, 7.6, 7.6 (Note)
Conflict 8 7.3.2
Conforms or Conformity 2 4.1 , 4.1 (Note 3, Note 3.a)
3 4.2.4
5 5.6.2.c
6 6.2.1, 6.2.1 (Note), 6.2.2.a, 6.3, 6.4
9 7.4.1
11 7.5.5, 7.6, 7.6
12 8.1 (a, b), 8.2.2.a
13 8.2.3, 8.2.4, 8.3, 8.3
14 8.4.b
Consequence 10 7.5.2
Considered or Consideration 7 7.2.1.d
12 8.2.2
13 8.2.3 (Note)
Consistent 4 5.4.1
7 7.1
11 7.6
Contain 9 7.3.3.c
Continually Improve, or Continual Improvement, or Continually Improving 2 4.1, 4.1.f
3 5.1
4 5.3.b
6 6.1.a
12 8.1.c
13 8.4, 8.5.1, 8.5.1
Contract(s) or Contractual 7 7.1 (Note 1), 7.2.1 (Note), 7.2.2, 7.2.2, 7.2.2.b
8 7.2.3.b
Control(s) or Controlled 2 4.1.c, 4.1, 4.1, 4.1 (Note 3, Note 3, Note 3.b, Note 3.c), 4.2.1.d
3 4.2.3, 4.2.3, 4.2.3, 4.2.3, 4.2.3.f, 4.2.4, 4.2.4, 4.2.4
8 7.3.1
9 7.3.7, 7.4.1
10 7.5.1, 7.5.1, 7.5.1
11 7.5.3, 7.5.4, 7.6
13 8.3, 8.3, 8.3
Corrected or Correction 12 8.2.2
13 8.2.3, 8.3
Corrective Action(s) 5 5.6.2.d
12 8.2.2
13 8.2.3
14 8.5.1, 8.5.2, 8.5.2, 8.5.2.f
Criteria 2 4.1.c
7 7.1.c
9 7.3.3.c
10 7.4.1, 7.5.2.a
12 8.2.2
13 8.2.4
Customer 2 4.1 (Note 3)
3 5.1.a
4 5.2, 5.2, 5.2
5 5.5.2.c, 5.6.2.b, 5.6.3.b
6 6.1.b, 6.1.b
7 7.2, 7.2.1 (a, b), 7.2.2, 7.2.2, 7.2.2
8 7.2.3, 7.2.3, 7.2.3.c, 7.2.3.c
10 7.4.3
11 7.5.4, 7.5.4, 7.5.4, 7.5.4, 7.5.4, 7.5.4 (Note)
12 8.2.1, 8.2.1, 8.2.1, 8.2.1 (Note, Note, Note)
13 8.2.4, 8.2.4, 8.2.4, 8.3.b
14 8.4.a, 8.5.2.a
Customer Requirements 2 4.1 (Note 3)
4 5.1.a, 5.2
5 5.5.2.c, 5.6.3.b
6 6.1.b
7 7.2.2
12 8.2.1
Customer Satisfaction 4 5.2
6 6.1.b
12 8.2.1, 8.2.1 (Note)
14 8.4.a
Damage or Damaged 11 7.5.4, 7.6.e
Data 11 7.5.4 (Note)
12 8.2.1 (Note)
13 8.4, 8.4, 8.4
14 8.4, 8.5.1
Dealer 12 8.2.1 (Note)
Decisions 5 5.6.3
Deficiencies 10 7.5.2
Define or Defined 2 4.1
3 4.2.3, 4.2.4
4 5.5.1
7 7.2.2 (a, c)
10 7.5.2.a
12 8.2.2, 8.2.2
13 8.3
14 8.5.2, 8.5.3
Degree 2 4.1 (Note 3.b)
Delay 12 8.2.2
Delivery or Delivered 7 7.2.1.a
9 7.3.6, 7.3.7
10 7.5.1.f, 7.5.2
11 7.5.5
12 8.2.1 (Note)
13 8.2.4, 8.2.4, 8.3.d
Demonstrate 10 7.5.2
12 8.1.a
13 8.2.3, 8.3, 8.4
Dependent 9 7.4.1
Describe(s) or Description 3 4.2.2.c
10 7.4.2, 7.5.1.a
Design(s) 8 7.3, 7.3.1, 7.3.1, 7.3.1, 7.3.1 (a, b, c), 7.3.1, 7.3.1, 7.3.1 (Note), 7.3.2, 7.3.2 (c, d), 7.3.3, 7.3.3, 7.3.3
9 7.3.3, 7.3.3.a, 7.3.4, 7.3.4, 7.3.4.a, 7.3.4 7.3.5, 7.3.5, 7.3.5, 7.3.6, 7.3.6, 7.3.7, 7.3.7, 7.3.7
Detected 12 8.2.2
13 8.3.a, 8.3.d
Deterioration 11 7.6.e
Determine, Determined, Determining, or Determination 2 4.1 (a, b, c) , 4.2.1.d
3 4.2.2.f
4 5.2
6 6.1, 6.2.2.a, 6.3, 6.4
7 7.1, 7.2.1, 7.2.1
8 7.2.3, 7.3.1, 7.3.2
11 7.6, 7.6, 7.6.c
12 8.1, 8.2.1, 8.2.2
13 8.2.3 (Note), 8.4
14 8.5.2 (b, d), 8.5.3, 8.5.3 (a, c)
Develop, Development 3 5.1
7 7.1, 7.1 (Note 2)
8 7.3, 7.3.1, 7.3.1, 7.3.1, 7.3.1 (a, b, c), 7.3.1, 7.3.1, 7.3.1 (Note), 7.3.2, 7.3.2.d, 7.3.3, 7.3.3, 7.3.3
9 7.3.3, 7.3.3.a, 7.3.4, 7.3.4, 7.3.4.a, 7.3.4, 7.3.5, 7.3.5, 7.3.5, 7.3.6, 7.3.6, 7.3.7, 7.3.7, 7.3.7
Directly 6 6.2.1 (Note)
Disposal 7 7.2.1 (Note)
Disposition 3 4.2.4
Distinct 8 7.3.1 (Note)
Document, Documents, Documented, or Documentation 2 4.1, 4.2, 4.2.1, 4.2.1 (a, c, d)
3 4.2.1 (Note 1, Note 1, Note 1, Note 1, Note 1), 4.2.1 (Note 2), 4.2.1 (Note 3), 4.2.2.b, 4.2.3, 4.2.3, 4.2.3, 4.2.3, 4.2.3 (a, b, c, d, e, f, g), 4.2.4
7 7.1.b, 7.1 (Note 1), 7.2.2
8 7.2.2
12 8.2.2
13 8.3
14 8.5.2, 8.5.3
Documented Procedure(s) 2 4.2.1.c, 4.2.1 (Note 1, Note 1)
3 4.2.2.b, 4.2.3, 4.2.4
12 8.2.2
13 8.3
14 8.5.2, 8.5.3
Education 6 6.2.1, 6.2.2.e
Effect(s) 9 7.3.7, 7.4.1
13 8.3.d, 8.3.d
14 8.5.2, 8.5.3
Effective or Effectiveness 2 4.1, 4.1.c, 4.2.1.d
3 4.2.4, 5.1
4 5.3.b
5 5.5.3, 5.6.1,5.6.3.a
6 6.1.a, 6.2.2.c
8 7.2.3, 7.3.1
12 8.1.c, 8.2.2.b
13 8.2.3 (Note), 8.4, 8.4
14 8.5.1, 8.5.2.f, 8.5.3.e
Eliminate 12 8.2.2
13 8.3.a
14 8.5.2, 8.5.3
Ensure or Ensuring 2 4.1 (c, d), 4.1, 4.1 (Note 3), 4.2.1.d
3 4.2.3 (c, d, e, f)
4 5.1.c, 5.1.e, 5.2, 5.3, 5.4.1, 5.4.2, 5.5.1
5 5.5.2 (a, c), 5.5.3, 5.6.1
6 6.2.2.d
7 7.2.2
8 7.2.2, 7.3.1
9 7.3.5, 7.3.6, 7.4.1
10 7.4.2, 7.4.3
11 7.6, 7.6
12 8.1.b, 8.2.2, 8.2.2
13 8.3
14 8.5.2.c
Environment or Environmental 6 6.4, 6.4, 6.4 (Note, Note)
Equipment 6 6.3.b
10 7.4.2.a, 7.5.1 (c, d), 7.5.2.b
11 7.6, 7.6, 7.6. 7.6, 7.6
Essential 8 7.3.2.d
9 7.3.3.d
Establish, Established, or Establishing 2 4.1
3 4.2.1 (Note 1), 4.2.2, 4.2.2.b, 4.2.3, 4.2.4, 4.2.4
4 5.1 (b, c), 5.3.c, 5.4.1
5 5.5.2.a, 5.5.3
7 7.1.b
10 7.4.1, 7.4.3, 7.5.2
11 7.6
12 8.2.2.a, 8.2.2, 8.2.2
13 8.3
14 8.5.2, 8.5.3
Evaluate, Evaluating, or Evaluation(s) 6 6.2.2.c
9 7.3.4.a, 7.3.7
10 7.4.1, 7.4.1, 7.4.1, 7.4.1, 7.4.1
13 8.4
14 8.5.2.c, 8.5.3.b
Evidence 3 4.2.4, 5.1
7 7.1.d
11 7.6
13 8.2.4
Exclusions 3 4.2.2.a
External Origin 3 4.2.3.f
External Party 2 4.1 (Note 2)
5 5.5.2 (Note)
Experience 6 6.2.1, 6.2.2.e
Extent 2 4.1, 4.1 (Note 3)
3 4.2.1 (Note 2)
9 7.4.1
12 8.1
13 8.2.3 (Note)
Factors 2 4.1 (Note 3)
6 6.4 (Note)
Feedback 5 5.6.2.b
8 7.2.3.c
Follow-up 5 5.6.2.e
13 8.2.2
Form 3 4.2.1 (Note 3)
7 7.1
8 7.3.3
Frequency 12 8.2.2
Functions or Functional 4 5.4.1
8 7.3.2.a
9 7.3.4
Generated 13 8.4
Groups 8 7.3.1
Handling 8 7.2.3.b
11 7.5.5, 7.6.e
Human Resources 6 6.2
Humidity 6 6.4 (Note)
Identify, Identified, Identifiable, or Identification 3 4.2.3 (c, e, f, g), 4.2.4, 4.2.4
9 7.3.4.b, 7.3.7
11 7.5.3, 7.5.3, 7.5.3, 7.5.3, 7.5.3 (Note), 7.5.4, 7.5.5, 7.6.c
13 8.3
Impact 2 4.1 (Note 3.a)
13 8.2.3 (Note)
Impartiality 12 8.2.2
Implement, Implemented, or Implementation 2 4.1, 4.1.f
3 4.2.1 (Note 1), 5.1
4 5.4.2.b
5 5.5.2.a
6 6.1.a
8 7.2.3
9 7.3.6, 7.3.7
10 7.4.3, 7.5.1 (e, f)
12 8.1, 8.2.2.b
14 8.5.2.d, 8.5.3.c
Importance 4 5.1.a
6 6.2.2.d
12 8.2.2
Improve or Improvement 2 4.1, 4.1.f, 4.1 (Note 1)
4 5.3.b
5 5.5.2.b, 5.6.1, 5.6.2.g, 5.6.3 (a, b)
6 6.1.a
12 8, 8.1, 8.1.c
13 8.4
14 8.5, 8.5.1, 8.5.1
Indirectly 6 6.2.1 (Note)
Industry 11 7.5.3 (Note)
Influenced 2 4.1 (Note 3)
Information 2 4.1.d
5 5.6.2
6 6.3.c
8 7.2.2 (Note), 7.2.3.a, 7.3.2.c
9 7.3.3.b, 7.3.3 (Note)
10 7.4.2, 7.4.2, 7.4.3, 7.5.1.a
12 8.2.1, 8.2.1
14 8.4.
Information Systems 6 6.3.c
Infrastructure 6 6.3, 6.3, 6.3
Input(s) 5 5.6.2, 5.6.2
8 7.3.2, 7.3.2, 7.3.2, 7.3.2, 7.3.3
9 7.3.3.a, 7.3.5
12 8.2.1 (Note)
Inspection 7 7.1.c
10 7.4.3
Integrity 4 5.4.2.b
Intends or Intended 7 7.2.1.b
9 7.3.6
10 7.4.3, 7.4.3
11 7.5.5
12 7.6 , 7.6 (Note)
13 8.3.c
Interaction(s) 2 4.1.b
3 4.2.1 (Note 2.b), 4.2.2.c
Interfaces 8 7.3.1
Internal 5 5.5.3
11 7.5.5
12 8.2.2, 8.2.2
Intervals 5 5.6.1
11 7.6.a
12 8.2.2
Invalidate 11 7.6.d
Involved 8 7.3.1
ISO 19011 13 8.2.2 (Note)
Justification 3 4.2.2.a
Known 7 7.2.1.b
9 7.3.6
Legible 3 4.2.3.e, 4.2.4
Lighting 6 6.4 (Note)
Lost 11 7.5.4
12 8.2.1 (Note)
Maintain, Maintained, or Maintenance 2 4.1
3 4.2.1 (Note 1) 4.2.2, 4.2.4
4 5.4.2.b, 5.5.2.a
5 5.6.1
6 6.1.a, 6.2.2.e, 6.3
7 7.2.1 (Note), 7.2.2
8 7.3.2
9 7.3.4, 7.3.5, 7.3.6, 7.3.7, 7.3.7
10 7.4.1
11 7.5.3, 7.5.3 (Note), 7.5.4, 7.5.5, 7.6.e, 7.6
12 7.6 (Note), 8.2.2.b, 8.2.2
13 8.2.4, 8.3
Manage, Managed, or Management 2 4, 4.1, 4.1.a, 4.1, 4.1, 4.1 (Note 1, Note 1), 4.1 (Note 2), 4.2.1
3 4.2.1 (Note 2), 4.2.2 (a, b, c), 4.2.3, 4.2.3.f, 4.2.4, 5, 5.1, 5.1, 5.1
4 5.1.d, 5.2, 5.3, 5.3.b, 5.4.1, 5.4.2, 5.4.2, 5.4.2 (a, b, b), 5.5.1
5 5.5.2, 5.5.2, 5.5.2, 5.5.2 (a, b, b), 5.5.2 (Note), 5.5.2 (Note), 5.5.3, 5.5.3, 5.6, 5.6.1, 5.6.1, 5.6.1, 5.6.1, 5.6.2, 5.6.2 (e, f), 5.6.3, 5.6.3.a
6 6, 6.1.a, 6.2.1 (Note), 6.4
7 7.1, 7.1 (Note 1)
8 7.3.1
10 7.4.2.c
11 7.5.3 (Note)
12 7.6 (Note), 8.1 (b, c), 8.2.1, 8.2.2, 8.2.2.a, 8.2.2
13 8.2.3, 8.2.3 (Note), 8.4, 8.4
14 8.5.1, 8.5.1
Management Review(s) 4 5.1.d
5 5.6, 5.6.1, 5.6.2, 5.6.2.e, 5.6.3
14 8.5.1
Manual 2 4.2.1.b
3 4.2.2, 4.2.2
Measure, Measuring, Measurable, or Measurement 2 4.1.e, 4.1 (Note 1)
4 5.4.1
7 7.1.c
10 7.5.1 (d, e), 7.5.2
11 7.5.3, 7.6, 7.6, 7.6, 7.6, 7.6, 7.6, 7.6 (a, a, d), 7.6
12 7.6, 8, 8.1, 8.2, 8.2.1
13 8.2.3, 8.2.3, 8.2.3 (Note), 8.2.4, 8.2.4, 8.4
Meet(s) or Meeting 4 5.1.a, 5.4.1, 5.4.2.a
6 6.1.b
7 7.1.d, 7.2.2.c
9 7.3.3.a, 7.3.4.a, 7.3.6
10 7.4.3
Method(s) 2 4.1.c
7 7.1
10 7.4.3, 7.5.2.c
12 8.1, 8.2.1, 8.2.2
13 8.2.3, 8.2.3, 8.2.3 (Note)
Monitor or Monitoring 2 4.1 (d, e)
7 7.1.c
10 7.5.1 (d, e), 7.5.2
11 7.5.3, 7.6, 7.6, 7.6, 7.6, 7.6
12 7.6, 8.1, 8.2, 8.2.1, 8.2.1 (Note)
13 8.2.3, 8.2.3, 8.2.3 (Note), 8.2.4, 8.2.4, 8.4
Nature 13 8.3
Need(s), Needed, or Necessary 2 4.1 (a, c, d, f), 4.1 (Note 1), 4.1 (Note 2), 4.1 (Note 3.c), 4.2.1.d
3 4.2.3, 4.2.3 (b, f), 4.2.4
4 5.4.1
5 5.5.2 (a, b), 5.6.1, 5.6.3.c
6 6.1, 6.2.2 (a, b), 6.3, 6.4
7 7.1, 7.1 (b, d), 7.2.1 (b, d)
9 7.3.4.b, 7.3.4, 7.3.5, 7.3.6, 7.3.7
10 7.4.1, 7.4.3, 7.5.1.b
11 7.6, 7.6, 7.6.b
12 7.6, 8.1, 8.2.2
14 8.5.2 (c, d), 8.5.3 (b, c)
Noise 6 6.4 (Note)
Nonconformity, Nonconforming, or Nonconformities 12 8.2.2
13 8.3, 8.3, 8.3, 8.3 (a, d, d), 8.3, 8.3
14 8.5.2, 8.5.2, 8.5.2 (a, b, c), 8.5.3, 8.5.3 (a, b)
Objectivity 12 8.2.2
Obligations 7 7.2.1 (Note)
Obtaining or Obtained 12 8.2.1, 8.2.1 (Note)
13 8.3
Occurrence 14 8.5.3, 8.5.3.b
One 3 4.2.1 (Note 1, Note 1, Note 2)
12 8.2.1
13 8.3
Operation(s) 2 4.1 (c, d), 4.2.1.d
3 4.2.3.f, 4.2.4
7 7.1
Opinion 12 8.2.1 (Note)
Opportunities 5 5.6.1
14 8.4.c
Order(s) 4 5.4.2.a
7 7.2.2, 7.2.2, 7.2.2.b
8 7.2.2 (Note), 7.2.3.b
11 7.5.5, 7.6.c
14 8.5.2, 8.5.3
Organization 2 4.1, 4.1, 4.1.a, 4.1, 4.1, 4.1, 4.1 (Note 2), 4.1 (Note 2), 4.1 (Note 3, Note 3.a), 4.2.1.d
3 4.2.1 (Note 2, Note 2.a), 4.2.2
4 5.1.a, 5.3.a, 5.3.d, 5.4.1, 5.5.1
5 5.5.2, 5.5.2.c, 5.5.3, 5.6.1
6 6.1, 6.2.2, 6.3, 6.4
7 7.1, 7.1, 7.1, 7.1 (Note 2), 7.2.1, 7.2.1.d, 7.2.2, 7.2.2, 7.2.2.c, 7.2.2
8 7.2.2, 7.2.3, 7.3.1, 7.3.1, 7.3.1, 7.3.1 (Note)
9 7.4.1
10 7.4.1, 7.4.1, 7.4.2, 7.4.3, 7.4.3, 7.4.3, 7.5.1, 7.5.2, 7.5.2
11 7.5.3, 7.5.3, 7.5.3, 7.5.4, 7.5.4, 7.5.4, 7.5.4, 7.5.4, 7.5.5, 7.6, 7.6, 7.6, 7.6
12 8.1, 8.2.1, 8.2.1, 8.2.2, 8.2.2.a
13 8.2.3, 8.2.3 (Note), 8.2.4, 8.3, 8.3, 8.4
14 8.5.1, 8.5.2, 8.5.3
Original 12 8.3.c
Output(s) 5 5.6.3, 5.6.3
7 7.1
8 7.3.1, 7.3.3, 7.3.3
9 7.3.3, 7.3.5
10 7.5.2
Outsource or Outsourced 2 4.1, 4.1, 4.1 (Note 2, Note 3, Note 3, Note 3.a)
Packaging 11 7.5.5
Participants 9 7.3.4
Parts 9 7.3.7
11 7.5.5
Perception 12 8.2.1, 8.2.1 (Note)
Perform, Performed, Performing, or Performance 2 4.1 (Note 2)
5 5.5.2.b, 5.6.2.c
6 6.2.1, 6.2.1 (Note), 6.2.2.a, 6.4 (Note)
8 7.3.2.a
9 7.3.4, 7.3.5, 7.3.6
10 7.4.3
12 8.2.1
Personal Data 11 7.5.4 (Note)
Personnel 3 4.2.1 (Note 2.c)
6 6.2.1, 6.2.1 (Note), 6.2.2 (a, d)
8 7.2.2
10 7.4.2.b, 7.5.2.b
Physical 6 6.4 (Note)
Plan, Planned, or Planning 2 4.1.f, 4.2.1.d
3 4.2.3.f
4 5.4, 5.4.2, 5.4.2 (a, b)
5 5.6.1
7 7.1, 7.1, 7.1, 7.1, 7.1, 7.1 (Note 1)
8 7.3.1, 7.3.1, 7.3.1, 7.3.1
9 7.3.4, 7.3.5, 7.3.6
10 7.5.1, 7.5.2
12 8.1, 8.2.2, 8.2.2.a, 8.2.2, 8.2.2
13 8.2.3, 8.2.3, 8.2.4, 8.2.4
Post-delivery 7 7.2.1.a, 7.2.1 (Note)
10 7.5.1.f
Potential 2 4.1 (Note 3.a)
13 8.3.d
14 8.5.3, 8.5.3, 8.5.3.a
Premises 10 7.4.3
Preserve or Preservation 9 7.33 (Note)
11 7.5.5, 7.5.5, 7.5.5, 7.5.5
Prevent 3 4.2.3.g
13 8.3
14 8.5.2, 8.5.3, 8.5.3.b
Preventive Action(s) 5 5.6.2.d
14 8.4.c, 8.5.1, 8.5.3, 8.5.3, 8.5.3 e
Previous or Previously 5 5.6.2.e
7 7.2.2.b
8 7.3.2.c
11 7.6
12 8.2.2
Problems 9 7.3.4.b
14 8.5.3
Process, Processes, or Processing 2 4.1 (a, b, c, d, e, f), 4.1, 4.1, 4.1, 4.1, 4.1 (Note 1, Note 1),4.1 (Note 2, Note 2), 4.1 (Note 3, Note 3, Note 3.a, Note 3.b), 4.2.1.d
3 4.2.1 (Note 2.b), 4.2.2.c
5 5.5.2.a, 5.5.3, 5.6.2.c, 5.6.3.a
6 6.3.b
7 7.1, 7.1, 7.1 (b, d), 7.1 (Note 1), 7.1 (Note 1), 7.1 (Note 2), 7.2
9 7.4.1
10 7.4.2.a, 7.5.2, 7.5.2, 7.5.2, 7.5.2, 7.5.2.a
11 7.5.5, 7.6
12 8.1, 8.2.2, 8.2.2
13 8.2.3, 8.2.3, 8.2.3, 8.2.3 (Note), 8.2.4
14 8.4.c
Procedure(s) 2 4.2.1.c,
3 4.2.1 (Note 1, Note 1, Note 1, Note 1), 4.2.2.b, 4.2.3, 4.2.4
10 7.4.2.a, 7.5.2.c
12 8.2.2
13 8.3
14 8.5.2, 8.5.3
Product(s) 2 4.1, 4.1 (Note 1), 4.1 (Note 3.a)
4 5.4.1
5 5.6.2.c, 5.6.3.b
6 6.2.1, 6.2.1 (Note), 6.2.2.a, 6.3, 6.4
7 7, 7.1, 7.1, 7.1, 7.1, 7.1 (a, b, c, c, d), 7.1 (Note 1, Note 1), 7.1 (Note 2), 7.2.1, 7.2.1.c, 7.2.2, 7.2.2, 7.2.2, 7.2.2.a
8 7.2.2, 7.2.2 (Note), 7.2.3.a, 7.3.1, 7.3.1 (Note), 7.3.2, 7.3.3 (c, d), 7.3.3 (Note)
9 7.3.6, 7.3.6, 7.3.7, 7.4.1, 7.4.1, 7.4.1, 7.4.1, 7.4.1
10 7.4.1, 7.4.2, 7.4.2.a, 7.4.3, 7.4.3, 7.4.3, 7.5.1 (a, f), 7.5.2
11 7.5.3, 7.5.3, 7.5.3, 7.5.3, 7.5.3, 7.5.4, 7.5.5, 7.5.5, 7.5.5, 7.6, 7.6
12 8.1.a, 8.2.1 (Note)
13 8.2.3 (Note), 8.2.4, 8.2.4, 8.2.4, 8.2.4, 8.2.4, 8.2.4, 8.3, 8.3, 8.3, 8.3, 8.3, 8.3, 8.3
14 8.4 (b, c)
Production 9 7.3.3.b, 7.3.3 (Note)
10 7.5, 7.5.1, 7.5.1, 7.5.2, 7.5.2
Progresses 8 7.3.1
Project 7 7.1 (Note 1)
Proper 9 7.3.3.d
Property 11 7.5.4, 7.5.4, 7.5.4, 7.5.4, 7.5.4 (Note, Note)
Propose 9 7.3.4.b
Protect, Protected, or Protection 3 4.2.4
11 7.5.4, 7.5.5, 7.6.e
Provide(s) or Provided 2 4.2.1 (Note 3.a)
3 4.2.4, 5.1
4 5.3.c
6 6.1, 6.2.2.b, 6.3
7 7.1 (b, d), 7.2.2
9 7.3.3.b
10 7.5.4, 7.6
14 8.4
Provision 2 4.1 (Note 1)
6 6.1
7 7.2.1 (Note)
9 7.3.3.b, 7.3.3 (Note)
10 7.5, 7.5.1, 7.5.1, 7.5.2, 7.5.2
Purchase, Purchasing, or Purchased 9 7.3.3.b, 7.4, 7.4.1, 7.4.1, 7.4.1, 7.4.1, 7.4.1
10 7.4.2, 7.4.2, 7.4.2, 7.4.2, 7.4.3, 7.4.3, 7.4.3, 7.4.3
Purpose(s) 4 4.2.3.g
5 5.3.a
8 7.3.1 (Note)
Qualification 10 7.4.2.b, 7.5.2.b
Quality Management System 2 4, 4.1, 4.1.a, 4.1, 4.1 (Note 1), 4.1 (Note 2), 4.2.1
3 4.2.1 (Note 2), 4.2.2 (a, b, c), 4.2.3, 4.2.3.f, 4.2.4, 5.1
4 5.3.b, 5.4.2, 5.4.2.(a, b, b)
5 5.5.2 (a, b), 5.5.2 (Note), 5.5.3, 5.6.1, 5.6.1, 5.6.2.f, 5.6.3.a
6 6.1.a, 6.2.1 (Note)
7 7.1, 7.1 (Note 1)
10 7.4.2.c
12 8.1 (b, c), 8.2.1, 8.2.2, 8.2.2.a
13 8.2.3, 8.2.3 (Note), 8.4, 8.4
14 8.5.1
Quality Manual 2 4.2.1.b
3 4.2.2, 4.2.2
Quality Plan 7 7.1 (Note 1)
Quality Objectives 2 4.2.1.a
4 5.1.c, 5.3.c, 5.4.1, 5.4.1, 5.4.1, 5.4.2.a
5 5.6.1
6 6.2.2.d
7 7.1.a
14 8.5.1
Quality Policy 2 4.2.1.a
4 5.1.b, 5.3, 5.3, 5.4.1
5 5.6.1
14 8.5.1
Readily Indentifiable 3 4.2.3.e, 4.2.4
Realization 2 4.1 (Note 1)
7 7, 7.1, 7.1, 7.1, 7.1, 7.1.d, 7.1 (Note 1), 7.1 (Note 2)
9 7.4.1
11 7.5.3, 7.5.3
13 8.2.4
Recommendations 5 5.6.2.g
Record(s) or Recorded 2 4.2.1 (c, d)
3 4.2.3, 4.2.4, 4.2.4, 4.2.4, 4.2.4
5 5.6.1
6 6.2.2.e
7 7.1.d, 7.2.2
8 7.3.1 (Note), 7.3.2
9 7.3.4, 7.3.5, 7.3.6, 7.3.7, 7.3.7
10 7.4.1
11 7.5.2.d, 7.5.3, 7.5.4, 7.6.a, 7.6, 7.6
12 8.2.2, 8.2.2
13 8.2.4, 8.3
14 8.5.2.e, 8.5.3.d
Recur or Recurrence 14 8.5.2, 8.5.2.c
Recycling 7 7.2.1 (Note)
Reference 3 4.2.2.b
9 7.3.3.c
Regulatory 2 4.1 (Note)
4 5.1.a
7 7.2.1.c
8 7.3.2.b
Release 8 7.3.3
10 7.4.3, 7.5.1.f
13 8.2.4, 8.2.4, 8.3.b
Relevant or Relevance 3 4.2.3.d
4 5.4.1
6 6.2.2.d
8 7.2.2, 7.2.2, 7.2.2 (Note)
13 8.2.4, 8.3.b, 8.4
Reports, Reported, or Reporting 5 5.5.2.b
11 7.5.4
12 8.2.1 (Note), 8.2.2, 8.2.2
Representative(s) 5 5.5.2, 5.5.2 (Note)
9 7.3.4
Requirement(s) 2 4.1, 4.1, 4.1, 4.1, 4.1 (Note 3, Note 3.a), 4.2
3 4.2.1 (Note 1, Note 1), 4.2.3, 4.2.4
4 5.1.a, 5.2, 5.3.b, 5.4.1, 5.4.2.a
5 5.5.2.c, 5.6.3.b
6 6.1.b, 6.2.1, 6.2.1 (Note), 6.2.2.a, 6.3, 6.4
7 7.1, 7.1.a, 7.1.d, 7.1 (Note 2), 7.2.1, 7.2.1 (a, a, b, c, d), 7.2.2, 7.2.2, 7.2.2 (a, b, c), 7.2.2, 7.2.2
8 7.2.2, 7.2.2, 7.3.2, 7.3.2 (a, b, d), 7.3.2
9 7.3.3.a, 7.3.4.a, 7.3.5, 7.3.6, 7.4.1
10 7.4.1, 7.4.2 (a, b, c), 7.4.2, 7.4.3
11 7.5.2.d, 7.5.3, 7.5.3, 7.6, 7.6, 7.6
12 7.6, 8.1.a, 8.2.1, 8.2.2.a, 8.2.2.a, 8.2.2
13 8.2.3 (Note), 8.2.4, 8.3, 8.3
14 8.4.b, 8.5.2, 8.5.3
Resource(s) 2 4.1.d, 4.1 (Note 1)
4 5.1.e
5 5.6.3.c
6 6, 6.1, 6.1, 6.2
7 7.1.b, 7.1 (Note 1)
Resource Management 6 6
Responsible, Responsibility or Responsibilities 2 4.1 (Note 3)
3 5
4 5.5, 5.5.1, 5.5.1
5 5.5.2, 5.5.2, 5.5.2 (Note)
8 7.3.1.c, 7.3.1
12 8.2.2, 8.2.2
13 8.3
Results or Resulting 2 4.1.f
5 5.6.2.a
7 7.1.d, 7.2.2
9 7.3.4.a, 7.3.4, 7.3.5, 7.3.6, 7.3.6, 7.3.7
10 7.4.1, 7.5.2, 7.5.2
11 7.6, 7.6.d, 7.6, 7.6
12 8.2.2, 8.2.2, 8.2.2,
13 8.2.2, 8.2.3, 8.2.3, 8.4
14 8.5.1, 8.5.2.e, 8.5.3.d
Retrievable 3 4.2.4
Re-validation 11 7.5.2.a
Re-verification 13 8.3
Review(s), Reviewed, or Reviewing 3 4.2.3.b
4 5.1.d, 5.3 (c, e)
5 5.6, 5.6.1, 5.6.1, 5.6.1, 5.6.2, 5.6.2, 5.6.2.e, 5.6.3, 5.6.3
7 7.2.2, 7.2.2, 7.2.2, 7.2.2, 7.2.2
8 7.2.2 (Note, Note), 7.3.1.b, 7.3.1 (Note), 7.3.2
9 7.3.4, 7.3.4, 7.3.4, 7.3.4, 7.3.4, 7.3.7, 7.3.7, 7.3.7
10 7.5.2.a
14 8.5.1, 8.5.2 (a, f), 8.5.3.e
Safe or Safeguard or Safeguarded 9 7.3.3.d
11 7.5.4, 7.6.d
Satisfy, Satisfactorily, or Satisfaction 4 5.2
6 6.1.b
12 7.6, 7.6 (Note), 8.2.1, 8.2.1 (Note)
13 8.2.4
14 8.4.a
Scope 3 4.2.2.a
12 8.2.2
Select or Selection 10 7.4.1, 7.4.1
12 8.2.2
Sequence 2 4.1.b
Service(s) 6 6.3.c
7 7.2.1 (Note, Note)
9 7.3.3.b. 7.3.3 (Note)
10 7.5, 7.5.1. 7.5.1, 7.5.2, 7.5.2, 7.5.2
13 8.2.4
Shall 2 4.1, 4.1, 4.1, 4.1, 4.1, 4.2.1
3 4.2.2, 4.2.3, 4.2.3, 4.2.3, 4.2.4, 4.2.4, 4.2.4, 5.1
4 5.2, 5.3, 5.4.1, 5.4.1, 5.4.2, 5.5.1
5 5.5.2, 5.5.2, 5.5.3, 5.6.1, 5.6.1, 5.6.1, 5.6.2, 5.6.3
6 6.1, 6.2.1, 6.2.2, 6.3, 6.4
7 7.1, 7.1, 7.1, 7.1, 7.2.1, 7.2.2, 7.2.2, 7.2.2, 7.2.2, 7.2.2
8 7.2.2, 7.2.3, 7.3.1, 7.3.1, 7.3.1, 7.3.1, 7.3.2, 7.3.2, 7.3.2, 7.3.2, 7.3.3, 7.3.3
9 7.3.3, 7.3.4, 7.3.4, 7.3.4, 7.3.5, 7.3.5, 7.3.6, 7.3.6, 7.3.6, 7.3.7, 7.3.7, 7.3.7, 7.3.7, 7.4.1, 7.4.1
10 7.4.1, 7.4.1, 7.4.1, 7.4.2, 7.4.2, 7.4.3, 7.4.3, 7.5.1, 7.5.1, 7.5.2, 7.5.2, 7.5.2
11 7.5.3, 7.5.3, 7.5.3, 7.5.4, 7.5.4, 7.5.4, 7.5.5, 7.5.5, 7.5.5, 7.6, 7.6, 7.6, 7.6.a, 7.6, 7.6, 7.6
12 7.6, 7.6, 8.1, 8.1, 8.2.1, 8.2.1, 8.2.2, 8.2.2, 8.2.2, 8.2.2, 8.2.2, 8.2.2, 8.2.2, 8.2.2
13 8.2.2, 8.2.3, 8.2.3, 8.2.3, 8.2.4, 8.2.4, 8.2.4, 8.2.4, 8.2.4, 8.3, 8.3, 8.3, 8.3 8.3, 8.3, 8.4, 8.4
14 8.4, 8.5.1, 8.5.2, 8.5.2, 8.5.2, 8.5.3, 8.5.3, 8.5.3
Shared 2 4.1 (Note 3.b)
Similar 8 7.3.2.c
Single 3 4.2.1 (Note 1)
Skills 6 6.2.1, 6.2.2.e
Software 6 6.3.b
12 7.6, 7.6 (Note)
Sources 12 8.2.1 (Note)
13 8.4
Specify, Specified, or Specifying 7 7.1 (Note 1), 7.2.1 (a, b)
9 7.3.3.d, 7.3.6, 7.4.1
10 7.4.2, 7.4.3
11 7.6.a
12 7.6
Stage(s) 8 7.3.1 (a, b)
9 7.3.4, 7.3.4
13 8.2.4
Standard(s) 2 4.1, 4.1, 4.2.1.c
3 4.2.1 (Note 1)
11 7.6.a, 7.6.a, 7.6.a
12 8.2.2.a
State, Stated or Statement(s) 2 4.2.1.a
7 7.2.1.b, 7.2.2
10 7.4.3
Statistical 12 8.1
Status 3 4.2.3.c
5 5.6.2.d
11 7.5.3, 7.6.c
12 8.2.2
Statutory 2 4.1 (Note 3)
4 5.1.a
7 7.2.1.c
8 7.3.2.b
Storage 3 4.2.4
11 7.5.5, 7.6.e
Subject 13 8.3
Submission 7 7.2.2
Subsequent 9 7.4.1
10 7.5.2
13 8.3
Suitable or Suitability 3 4.2.3.g
4 5.3.e
5 5.6.1
7 7.1
8 7.3.1 (Note), 7.3.3
9 7.3.4
10 7.5.1.c
11 7.5.3
12 7.6 (Note)
13 8.2.3, 8.2.3 (Note), 8.4
Supplementary 7 7.2.1 (Note)
Supplier(s) 9 7.4.1
10 7.4.1, 7.4.2, 7.4.3
14 8.4.d
Supply 7 7.2.2
10 7.4.1
Support or Supporting 2 4.1.d
6 6.3.c
Surveys 12 8.2.1 (Note, Note)
Systematic 9 7.3.4
Task 6 6.2.1 (Note)
Techniques 12 8.1
Temperature 6 6.4 (Note)
Tenders 7 7.2.2
Test 7 7.1.c
Top Management 3 5.1
4 5.2, 5.3, 5.4.1, 5.4.2, 5.5.1
5 5.5.2, 5.5.2.b, 5.5.3, 5.6.1
Traceable or Traceability 11 7.5.3, 7.5.3, 7.5.3 (Note), 7.6, 7.6.a
Training 6 6.2.1, 6.2.2, 6.2.2 (b, e)
Trends 14 8.4.c
Type 2 4.1, 4.1 (Note 3)
3 4.2.1 (Note 2.a), 4.2.1 (Note 3), 4.2.3
9 7.4.1
13 8.2.3 (Note)
Unambiguous 8 7.3.2
Undertaken 11 7.6, 7.6
Unintended 3 4.2.3.g
13 8.3
Unique 11 7.5.3
Unsuitable 11 7.5.4
Update or Updated 3 4.2.3.b
8 7.3.1
Use, Used, or Using 3 4.2.3 (d, g)
7 7.2.1.b
9 7.3.3.d, 7.3.6
10 7.5.1 (c, d), 7.5.2, 7.5.2.c
11 7.5.4, 7.5.4, 7.5.4, 7.6.a, 7.6.a
12 7.6, 7.6, 7.6 (Note), 8.1, 8.2.1
13 8.3, 8.3 (b, c, d)
14 8.5.1
User 12 8.2.1 (Note)
Valid or Validity 11 7.6, 7.6
Validate, Validated, or Validation 7 7.1.c
8 7.3.1.b , 7.3.1 (Note)
9 7.3.6, 7.3.6, 7.3.6, 7.3.6, 7.3.7
10 7.5.2, 7.5.2, 7.5.2
Verify, Verified, or Verification 7 7.1.c
8 7.3.1.b, 7.3.1 (Note), 7.3.3
9 7.3.5, 7.3.5, 7.3.5, 7.3.7
10 7.4.3, 7.4.3, 7.4.3, 7.5.2
11 7.5.4, 7.6.a, 7.6.a, 7.6
12 7.6 (Note)
13 8.2.2, 8.2.2, 8.2.4
Warranty 7 7.2.1 (Note)
12 8.2.1 (Note)
Weather 6 6.4 (Note)
Work 6 6.2.1, 6.2.2.a, 6.4, 6.4 , 6.4 (Note, Note)
10 7.5.1.b
12 8.2.2
Work Environment 6 6.4, 6.4 , 6.4 (Note)
Work Instruction 10 7.5.1.b
Workspace 6 6.3.a

We are committed to providing effective training, reliable consulting, and valuable auditing. If you have any questions about our services, please call us at 770-517-7944. You may also contact us by fax at 770-517-7945 or email to Larry@WhittingtonAssociates.com.

-top-

Frogtown's North Georgia Web Design.

Send this page to a friend